The expedition takes place in four phases.
The first brings us to Everest Nepalese base camp on Khumbu glacier at 5340 meters. From Paris, we will fly to Kathmandu with a final check-up of our gear. At Kathmandu, We will still be able to find material from old Himalayan expeditions. Then we ll’ take plane to Lukla where the trek begins through Khumbu valley.
The second phase will be acclimatization. Our bodies have to get used to the very high altitude, climbing gradually from base camp. We will limit our passages through the infamous icefall and its numerous dangers. We will include the climb to Lobuche Peak at 6119 meters. Then we'll go for final trip to camp III at 7300m, with two nights at Camp II at 6450m and one at camp III. We can then determine if we are able to attempt the summit.
The third phase will be the ascent itself, from 5300 meters to hopefully 8850 meters via 4 altitude camps. We plan to back down in two days. This attack will surely be preceded by a wait at base camp (5300m) the weather window, high temperatures and low winds.
The fourth phase is the return to Kathmandu down trough Khumbu valley and by plane from Lukla.
L’expédition se déroulera du 28 mars au 7 juin 2009. C’est en effet à cette période de l’année que les conditions météos sont optimales pour tenter l’ascension du troisième pôle.
L’Everest se situe dans l’est de la chaîne de l’Himalaya, il subit chaque année l’arrivée de la mousson en provenance du golfe du Bengale au cours de l’été. La mousson ouvre une fenêtre météo sur la montagne en repoussant au nord les vents violents, de plus de 100 km/h, qui sévissent habituellement ce qui permet aux alpinistes de fouler les pentes sommitales sans risquer de s’envoler ou de geler sur place. L’air chaud et humide de la mousson apporte un surcroît de température bienvenu mais aussi dans un deuxième temps de fortes précipitations sous forme de neige. Le but de l’expédition est donc d’être prêt lors de cette fenêtre météo qui intervient toujours entre mi-mai et les premiers jours de juin, et dont la durée peut être variable, de quelques jours à deux semaines.
Timetables are given in local time
Eugene Blue
Monique Green
Saturday 28 March 2009 - Day # 0
13h20: departure from Marseille by Air France flight AF7665 to Roissy Charles de Gaulle
14h50: Arrival at Roissy
21h45: departure to Abu Dhabi by Etihad flight EY 0038
07h30: arrival in Abu Dhabi
Sunday 29 March 2009 - Day # 1
14h10: Departure to Kathmandu Etihad flight EY 0292
20h15: Arrival in Kathmandu
21:00: meeting at the Hotel Tibet http://www.hotel-tibet.com/
Monday 30 March 2009 - Day # 2
Morning: Equipment check with guides and Sherpas and ultimate packages that will leave by helicopter and yaks up to base camp.
Afternoon free to visit capital of Nepal.
Tuesday 31 March 2009 - Day # 3
Flight Kathmandu to Lukla (2840m) by Yeti Airlines and trekking up to Phakding (2610m)
Wednesday 1st April 2009 - Day # 4
Trekking Phakding to Namche Bazar (3440m) capital of Sherpa’s country
Thursday 2 April 2009 - Day # 5
Trekking Khumjung to Namche Bazar (3780m)
Friday 3 April 2009 - Day # 6
Acclimatization in Khumjung
Saturday 4 April 2009 - Day # 7
Trekking Khumjung up to Tengpoche (3860m)
18h45: Departure from Roissy to Hong Kong by Cathay Pacific
Sunday 5 April 2009 - Day # 8
Trekking Tengpoche up to Dingboche (4410m)
12:55: arrival in Hong Kong
18h55: Departure to Kathmandu from Hong Kong by Cathay Pacific
21h25: Arrival in Kathmandu and overnight at the Hotel Tibet
Monday 6 April 2009 - Day # 9
Trekking Dingboche to Lobuche (4910m)
Morning: Equipment check with guides and Sherpas and ultimate packages that will leave by plane.
Afternoon free to visit the capital of Nepal.
Tuesday 7 April 2009 - Day # 10
Acclimatization in Lobuche
Flight Kathmandu to Lukla (2840m) by Yeti Airlines and trekking up to Phakding (2610m)
Wednesday 8 April 2009 - Day # 11
Acclimation in Lobuche
Trekking Phakding to Namche Bazar (3440m) Sherpa capital of the country
Thursday 9 April 2009 - Day # 12
Lobuche trekking up to Base Camp (5340m)
Trekking Khumjung to Namche Bazar (3780m)
Friday 10 April 2009 - Day # 13
Acclimatization in Base Camp
Acclimatization in Khumjung
L’expédition se déroulera du 28 mars au 7 juin 2009. C’est en effet à cette période de l’année que les conditions météos sont optimales pour tenter l’ascension du troisième pôle.
L’Everest se situe dans l’est de la chaîne de l’Himalaya, il subit chaque année l’arrivée de la mousson en provenance du golfe du Bengale au cours de l’été. La mousson ouvre une fenêtre météo sur la montagne en repoussant au nord les vents violents, de plus de 100 km/h, qui sévissent habituellement ce qui permet aux alpinistes de fouler les pentes sommitales sans risquer de s’envoler ou de geler sur place. L’air chaud et humide de la mousson apporte un surcroît de température bienvenu mais aussi dans un deuxième temps de fortes précipitations sous forme de neige. Le but de l’expédition est donc d’être prêt lors de cette fenêtre météo qui intervient toujours entre mi-mai et les premiers jours de juin, et dont la durée peut être variable, de quelques jours à deux semaines.
Timetables are given in local time
Eugene Blue
Monique Green
Saturday 11 April 2009 - Day # 14
Trekking from Khumjung up to Phortse Tenga (3680m)
Acclimatization in Base Camp
Sunday 12 April 2009 - Day # 15
Trekking from Phortse up to Machermo (4410m)
Acclimatization in Base Camp
Monday 13 April 2009 - Day # 16
Trekking to Gokyo (4790m)
Training in crossing crevasses and seracs
Tuesday 14 April 2009 - Day No. 17
Ascent of Gokyo Ri Trekking to Tanngank (4700m)
Ascent of Kala Pattar (5550m)
Wednesday 15 April 2009 - Day # 18
Resting in Tanngank
Acclimatization in Base Camp
Thursday 16 April 2009 - Day # 19
Climb of Cuguma La and Trekking to Dzonglha (4830m)
Training in crossing crevasses and seracs
Friday 17 April 2009 - Day # 20
Trekking from Dzonglha to Lobuche (4910m)
Climb to 6000 meters
Saturday 18 April 2009 - Day # 21
Acclimatization in Base Camp
Trekking from Lobuche to Everest Base Camp (5300m)
Sunday 19 April 2009 - Day # 22
Kala Pattar’s climb (5550m)
Kala Pattar’s climb (5550m)
Monday 20 April 2009 - Day # 23
Down to Lobuche (4910m)
Down to Lobuche (4910m)
Tuesday 21 April 2009 - Day # 24
Rest in Lobuche (4910m)
Rest in Lobuche (4910m)
Wednesday 22 April 2009 - Day # 25
Climb to Camp 1 on Lobuche East Peak (5600m)
Climb to Camp 1 on Lobuche East Peak (5600m)
Thursday 23 April 2009 - Day No. 26
Ascent of Lobuche East Peak (6119m)
Ascent of Lobuche East Peak (6119m)
Friday 24 April 2009 - Day # 27
Rest in Lobuche (4910m)
Rest in Lobuche (4910m)
L’expédition se déroulera du 28 mars au 7 juin 2009. C’est en effet à cette période de l’année que les conditions météos sont optimales pour tenter l’ascension du troisième pôle.
L’Everest se situe dans l’est de la chaîne de l’Himalaya, il subit chaque année l’arrivée de la mousson en provenance du golfe du Bengale au cours de l’été. La mousson ouvre une fenêtre météo sur la montagne en repoussant au nord les vents violents, de plus de 100 km/h, qui sévissent habituellement ce qui permet aux alpinistes de fouler les pentes sommitales sans risquer de s’envoler ou de geler sur place. L’air chaud et humide de la mousson apporte un surcroît de température bienvenu mais aussi dans un deuxième temps de fortes précipitations sous forme de neige. Le but de l’expédition est donc d’être prêt lors de cette fenêtre météo qui intervient toujours entre mi-mai et les premiers jours de juin, et dont la durée peut être variable, de quelques jours à deux semaines.
Timetables are given in local time
Eugene Blue
Monique Green
Saturday 25 April 2009 - Day # 28
Down from Pangboche to Lobuche (3930m)
Trekking from Lobuche to Base Camp (5340m)
Sunday 26 April 2009 - Day # 29
Down from Pangboche to Namche Bazar (3440m)
Rest at Base Camp
Monday 27 April 2009 - Day # 30
Down from Namche Bazaar to Lukla (2840m)
Training in crossing crevasses and seracs
Tuesday 28 April 2009 - Day # 31
Return flight to Kathmandu
Climb to Camp II (6450m)
Wednesday 29 April 2009 - Day # 32
Back in France
Rest at Camp II (6450m)
Thursday 30 April 2009 - Day No. 33
Climb to Camp III (7300m)
Friday 1st May 2009 - Day # 34
Down to Camp II (6450m)
Saturday 2 May 2009 - Day # 35
Descent to Base Camp (5340m)
Sunday 3 May 2009 - Day # 36
Rest at Base Camp
Monday 4 May 2009 - Day No. 37
Rest at Base Camp
on Google Earth
Timetables are given in local time
Eugene Blue
Monique Green
Until 30 May 2009 - Day # 63
Waiting for the weather window and climb to summit
1st day of climbing, climb to Camp II (6450m)
2nd day of climbing, climb to Camp III (7300m)
3rd day of climbing, climb to Camp IV (7950m) at South Col
4th day of climbing, climb to the summit (8848m) and return to Camp IV
5th day of climbing, down to Camp II (6450m)
6th day of climbing, down to base camp
Sunday 31 May 2009 - Day # 64
Rest at Base Camp
Monday 1st June 2009 - Day #. 65
Down from Base Camp to Lobuche (4910m)
Tuesday 2 June 2009 - Day # 66
Down from Lobuche to Pangboche (3930m)
Wednesday 3 June 2009 - Day # 67
Down from Pangboche to Namche Bazar (3440m)
Thursday 4 June 2009 - Day # 68
Down from Namche Bazaar to Lukla (2840m)
Friday 5 June 2009 - Day # 69
Return flight to Kathmandu
Saturday 6 June 2009 - Day # 70
Rest Day in Kathmandu and summit celebrations
Sunday 7 June 2009 - Day # 71
Back in France
on Google Earth
on Google Earth
on Google Earth